Sunday, October 4, 2026

Painted and then around the bend.

We painted the frames yesterday and removed the masking tape this morning, then we installed the middle window that we had obtained from a local chap called Sunny on marketplace, it was a heavy window but we wrangled it into our frame quite easily and screwed it in, there will be some trim work to be done on the outside and inside. 

In addition another large sheet of 34" x 76" patio door glass was moved over from the work area using our strap system and safely installed even though we are running out of places to use clamps.

The layout of the windows for the back wall has been mapped out and it looks like we will have enough wood in stock to complete the greenhouse. It may be desired to buy a couple of correct sized pieces for various trim work, however, we will attempt to resist as we know money can always be better used by buying beers.

No comments:

Post a Comment