The weather is changing and it is definitely October!

The project is almost finished, except for some trim pieces and that door, but we will have to wait for a couple of warm, dry days to work on it, it needs to be sanded, painted and of course, installed. 

As the greenhouse is mostly waterproof and quite sheltered from the winds there are opportunities to complete some details inside the structure and here are photos of some of them :

The shelf in the front right corner, two brackets and a piece of wood, we will be making a couple more brackets in the next few days and placing a very similar shelf in the back right corner.

The two shelves on the left hand side with pegboard between them, a place to hang all the tools. These windows are the sliding ones, so plenty of additional ventilation will be available in the summer months.

It was a blustery, wet day and we installed the edge and painted it, once again we are running out of paint, but there are only pieces of trim to be done, the door will be white and we already have good quality Dulux exterior paint for that, so that is covered, or will be after we have sanded it.