Monday, August 24, 2026

Wall number two

Another day goes by and we made ourselves busy by creating the second end of the greenhouse. This assembly will be called wall number two. 


This one seemed to be a little easier than the other, it was also less heavy so moving it over to the job site was not so bad. There we have it, the two ends completed and lying on top of the base frame and we think that the next bit will be to "build the barn" and create the structure, which will require a couple of temporary pieces of wood to act as ties and guides to make wall one square with the frame, followed by two 145" composite beams to connect wall one and two together. 

It may even require an extra pair of hands.

After that, we can start adding wood and windows and start thinking about a roof structure.

No comments:

Post a Comment